Documentation
Onboarding
Getting Started
Power & Battery
Hardware & Components
Build & Assembly
Radio & RF Design
Frequencies & Regulations
Firmware & Software
USB & Connectivity
GPS & Navigation
Morse & Communication
Modes & Operation
Field Operations & Rescue
Building Effectively
Build Variants
Project & Reference
Docs Build & Assembly Waterproof Build

Waterproof Build

Edit on GitHub

Taking the beacon to IP67: case sealing, connector treatment, and the assembly order that keeps water out of the electronics.

Waterproof Build

A rescue device that dies in rain is not a rescue device. The waterproof build takes the standard case and closes every water path, systematically.

The water paths

PathFix
Case seamGasket or silicone seal
USB portNot present in the sealed build (flash before sealing)
Antenna mountSMA with O-ring or dielectric grease
Button holesMembrane buttons or sealed caps
Audio jackSealed jack or delete it
Battery accessClosed case, or a gasketed door

The assembly order

  1. Complete and test ALL electronics outside the case (see First Power On Protocol).
  2. Flash the final configuration.
  3. Seal the USB port (tape or epoxy) or omit it from the case cutout.
  4. Mount everything, route the antenna cable, close the case with the gasket.
  5. Water test: 30 minutes in a sink, then open and inspect for droplets.

Materials

MaterialUse
Silicone gasket or RTVCase seam
Dielectric greaseConnector threads
Membrane buttonsThe button openings
Hot glue or epoxyCable entries

The honest trade-off

Sealing costs access: changing settings needs the WiFi portal (which works through the case, see WiFi Config Portal), and changing the battery needs opening the case. For most users, the right compromise is a gasketed case with a battery door rather than a permanently sealed one.

Testing after sealing

The sealed build must repeat the bench tests: the gasket and seals do not affect RF, but the antenna mount does. Re-run Receiver Testing and Transmitter Testing after the seal, not before.